Site Output Board
Every location

Overview

9 people recorded work at 4 locations

Units completed
950
over 23 working days
People reporting
9
across 4 locations

Units per day

Busiest: Sep 18, 74 units
Sep 14
Sep 21
Sep 28
Oct 5

Downtime split

27 h total
Hardest hit: North Unit, 12.5 h

By location

  1. 1
    320
    34% share
  2. 2
    226
    24% share
  3. 3
    216
    23% share
  4. 4
    188
    20% share

By work code

Top 3
  1. 1
    WLD · Weld check
    228
    38% share
  2. 2
    BJ · Bolted joint check
    189
    32% share
  3. 3
    RT · Film review
    181
    30% share

By person

  1. 1
    167
    18% share
  2. 2
    136
    15% share
  3. 3
    123
    13% share
  4. 4
    121
    13% share
  5. 5
    119
    13% share
  6. 6
    105
    11% share
  7. 7
    80
    9% share
  8. 8
    75
    8% share

Latest work

163 records
  • Thu8Oct
    WLDWeld check7 units
    3:28 PM
  • Thu8Oct
    WLDWeld check3 units
    3:17 PM
  • Thu8Oct
    BJBolted joint check2 units
    12:49 PM
  • Thu8Oct
    RTFilm review2 units
    11:31 AM
  • Thu8Oct
    VTVisual walkdown4 units
    9:47 AM
  • Thu8Oct
    RPTReport package1 unit
    9:26 AM
  • Thu8Oct
    BJBolted joint check2 units
    7:03 AM
  • Wed7Oct
    VTVisual walkdown7 units
    12:47 PM
  • Wed7Oct
    RPTReport package1 unit
    12:16 PM
  • Wed7Oct
    WLDWeld check10 units
    11:56 AM

    Barge loading arms, east berth

  • Wed7Oct
    UTTThickness shots10 units
    10:10 AM

    Both sides of the header crossover

  • Wed7Oct
    WLDWeld check9 units
    8:25 AM

Latest downtime

14 records
  • Waiting2.5 h

    Escort for the restricted area was not available

    Wed, Oct 7
  • Waiting1 h

    Lightning hold, everyone off the structures

    Tue, Oct 6
  • Waiting2 h

    Permit renewal ate most of the morning

    Mon, Oct 5
  • Waiting1 h

    No bucket truck free until after lunch

    Thu, Oct 1
  • Unplanned3 h

    Witnessed a last-minute hydrotest on a new spool

    Wed, Sep 30
  • Waiting1.5 h

    Gas test needed before entry, tester was across the plant

    Tue, Sep 29
  • Waiting2.5 h

    Operations asked us to hold until the line was drained

    Fri, Sep 25
  • Unplanned1 h

    Covered a walkdown for another crew that was short a person

    Fri, Sep 25
  • Unplanned2.5 h

    Checked a hose connection after a near-miss report

    Thu, Sep 24
  • Waiting1 h

    Scaffold on the cooling tower deck not tagged until 10

    Wed, Sep 23
All demos
DemoClient B · Industrial inspections firm